Skip to main content

Fall Road Maintenance

Over 1 mile of Loma Linda (between Saddleback intersection and Buck Dr) and (between San Juan around the curve to the bottom of the hill) had new material put down.  

Additional blading was completed on the entrance & the mainloop.

Several other roads were bladed including Buck Dr, Eight Mile Loop, and parts of Echo, Bonita,  and Loma Vista.

Ditches along several miles of roads were bladded / re-ditched.