Spring Road Maintenance
Many Roads have been graded in April 2025
At the regular May 13 Board Meeting a 3 Phase approach to roads was discussed and approved.
1) The Main Loop, Buck, Bonita, and Eight MIle Loop from Bonita to Loma Vista will be DRY BLADED - this process will bring the gravel already on the roads up to the surface
2) After review of the success of #1 above determination will be made if more material usomg a different and more expensive mix of dirt, sand, and gravel will be added to the areas still in need.
3) Mag will be added where needed